Manufacturer Part# / Cross Reference Search

Please use this search function to find READY die set components that are equivalent to commonly used pins, bushing, ISO Springs, and Gas Springs from other manufacturers. Please Note: We believe this cross reference to be accurate. Please review the specifications to ensure the item will work in your application. Gas Spring equivalents were based on body dimensions, on contact force and stroke length.

Conforms with Renault’s mounting, charge port and body height requirements. Also meets all ISO and VDI piston rod and body diameter specifications. The SE-Series provides the same force as the LE-ISO Series with an overall height reduction up to -50mm! All models are compatible with the optional Shield Scraper and can be connected to a linked hose system. Meets VDI Safety protocols.
Unit of Measure

Specifications

Brands

Ready

Pressure Medium

Nitrogen Gas (N2)

Maximum Charging Pressure

150 bar

Minimum Charging Pressure

35 bar

Rod Seal Area

19.63 cm²

Operating Temperature

0 to 80 ºC

Force Increase by Temperature

0.33 %/°C

Maximum Stem Speed

1.6 m/s

Maintenance Kit

Kit KF3000

Maximum Stroke

56 strokes/min

Stroke Length

38 mm

Volume

0.290 L

Weight

4.20 kg

Industry Standards/Certifications

Association of German Engineers (VDI) Pressure Equipment Directive (PED 2014/68/UE) RENAULT (EM24.54/700/F)

Equivalent Part Numbers

Hyson: T2L-3000x38 Special Spring: S3000-038-A Tecapres No: TPKF3000x38

Product Code

GS

Charging Pressure

Fully Open Force (Fo) at 20 Degree Celsius (ºC) Temperature

3000 daN

90 Percent (%) Fully Closed Force (F)

3910 daN

100 Percent (%) Fully Closed Force (Fc)

4045 daN

Charging Pressure at 20 Degree Celsius (ºC) Temperature

150 bar

Dimensions

Fully Open Length (Lo)

146 mm

Fully Closed Length (Lc)

108 mm

Housing Outside Diameter (D)

95 mm

Piston Outside Diameter (d)

50 mm

Mount-Piston Rod Distance (Piston Closed) (P)

21 mm

Ring Groove (r)

2.5 mm

Diagram

Dimension Key Nitrogen Gas Spring

Note

Note

Product improvement through research and development is an ongoing process. All specifications are subject to change without notice.